Hasanpour, Javad, Ghodoosi, Mohammad, Hosseini, Zahra Sadat. “Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms.” Journal of Optimization in Industrial Engineering, vol. 10, no. 21, 2016, pp. 79-92. 10.22094/joie.2016.263