Fantidis, J. G. (2018) ‘Beam shaping assembly study for BNCT facility based on a 2.5 MeV proton accelerator on Li target’, Journal of Theoretical and Applied Physics, 0(4), pp. 249-256. doi:10.1007/s40094-018-0312-1