Mirabi, Mohammad, T. Fatemi Ghomi, S. M., . Jolai, F (2014) ‘A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem’, Journal of Industrial Engineering International, 10(2), pp. 0-0. doi: